Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the acf domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/iteclbco/projects.automationmate.com/wp-includes/functions.php on line 6131

Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the updraftplus domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/iteclbco/projects.automationmate.com/wp-includes/functions.php on line 6131

Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the wordpress-seo domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/iteclbco/projects.automationmate.com/wp-includes/functions.php on line 6131
ATS - Automate

ATS

NDL (Notre Dame Louize) ATS, power distribution, and controlling 3 Generators in addition to the EDL sourcing the whole school and its entire facilities, with remote features and SCADA.

Remote features to include access screens from the comfort of the manager phone, with full control capabilities on all power consumption and Generators, etc…

SCADA, for detailed monitoring, archiving and reporting of all the system parameters such as Fuel, power consumption, and many more

Download PDF

For any inquiry or support, please contact us at support@automationmate.com