Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the acf domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/iteclbco/projects.automationmate.com/wp-includes/functions.php on line 6170

Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the updraftplus domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/iteclbco/projects.automationmate.com/wp-includes/functions.php on line 6170

Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the wordpress-seo domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/iteclbco/projects.automationmate.com/wp-includes/functions.php on line 6170
Junker line upgrade - Automate

Junker line upgrade

REQUIREMENTS OF THE CUSTOMER:

•Reprogramming the machine code using old PLC2 most of PLC code, and adding some additional features.

•Deliver 4 remote IO racks including PLC rack, reprogramming, and startup.

•Short installation and startup period.

BENEFITS OF THE CUSTOMER:

•Delivery of the complete system within few weeks, conserving machine functionality even if complete automation system was replaced, more events and alarms were displayed using Panel View HMI.

•New hardware used, available in the market comparing to PLC2 obsolete hardware.

•It is possible to reduce operational costs by identifying the errors and fault functions whenever occurring.

•It is possible to reduce maintenance costs by installation a maintenance computer stating of studio 5000 service edition, so all interlocks could be detected whenever faults occur.

IMPLEMENTATION:

•Using the PLC capabilities that enhance software cycle time, new functions comparing to old PLC2 8 bits instructions.

•Know how, experience, support.

•Studio 5000 V30, Factory talk view ME.

•Fast delivery time, a startup in few days, machine operations were exactly the same comparing to the old method of operation which is an advantage for the Operators.

•sing the PLC capabilities that enhance the software.