Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the updraftplus domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/iteclbco/projects.automationmate.com/wp-includes/functions.php on line 6114

Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the wordpress-seo domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/iteclbco/projects.automationmate.com/wp-includes/functions.php on line 6114
Musheireb Metro-Building automation control system field devices - Automate

Musheireb Metro-Building automation control system field devices

REQUIREMENTS OF THE CUSTOMER:

  • Supply BMS field devices and FCU control panel.
  • Testing and commissioning for the field devices and FCU control panel including BMS interface.
  • Supervision for installation and wiring.
  • BTU meters and communication protocol conversion gateway supply, testing, and commissioning.
  • Provide training for the Qatar Rail maintenance team.

BENEFITS FOR THE CUSTOMER:

  • The support is given for installation and wiring so the issues for field devices will be minimal.
  • Products are more reliable and a three-year replacement warranty is provided.
  • Testing is done by specialists so BMS main integrator job will be easy.
  • Maintenance support is provided at any time.
  • Training provided for technicians for installation and wiring so they will do proper work based on the training.

IMPLEMENTATION:

  • Programming and testing commissioning for FCU control panel.
  • Supervision for the sensor installation and cabling.
  • BTU meter configuration and flow meter configuration.
  • Water meter configuration and BMS interface through a communication protocol.
  • Field device testing and BMS interface.
  • Provide training for the Qatar Rail maintenance team.

Download PDF

For any inquiry or support, please contact us at support@automationmate.com