Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the updraftplus domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/iteclbco/projects.automationmate.com/wp-includes/functions.php on line 6114

Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the wordpress-seo domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/iteclbco/projects.automationmate.com/wp-includes/functions.php on line 6114
Al Rayyan Stadium-Supply of FCU control panel and field devices - Automate

Al Rayyan Stadium-Supply of FCU control panel and field devices

REQUIREMENTS OF THE CUSTOMER :

•Supply BMS field devices and FCU control panel.
•Testing and commissioning for the field devices and FCU control panel including BMS interface.
•Supervision for installation and wiring.
•Training for the maintenance team.


BENEFITS FOR THE CUSTOMER:


•Support given for installation and wiring preventing any eventual issues.
•Products are more reliable.
•Testing done by specialists so BMS main integrator job will be easy.
•Maintenance support provided at any time.
•Training provided for technicians for installation and wiring so they will do proper work based on the training.


IMPLEMENTATION:


• Programming, testing, and commissioning for FCU control panel.
• Supervision for the sensor installation and cabling.
• Field device testing and BMS interface.

For any inquiry or support, please contact us at support@automationmate.com