Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the updraftplus domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/iteclbco/projects.automationmate.com/wp-includes/functions.php on line 6114

Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the wordpress-seo domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/iteclbco/projects.automationmate.com/wp-includes/functions.php on line 6114
Common Seawater Supply - For Oil and Gas application - Automate

Common Seawater Supply – For Oil and Gas application

REQUIREMENTS OF THE CUSTOMER :

• Full control system and SCADA station for the water treatment plant

• Power and automation system for all the facility

CHALLENGES / VISIONS / NEEDS

• Supply and setup of instruments, calibration, scaling and commissioning on site.

• Calibration, commissioning of sophisticated ow control valves (FCV) and motorized ball valves (MBV), calibration of analog input set point and analog output feedback to PLC.

• Control of working hours of Main generators in Duty / Standby mode

• Analysis of PH, conductivity and Turbidity readings at each process stage to define  the efficiency of the system.

• Supply and commissioning of PFC power factor correction cabinet with 3 steps.

• Supply and commissioning of VFD found at sea cabinet for Raw Water Pump RWP to control the main water ow supplied to the system , including pump motor overheat protection .

• Providing support to mechanical team in eliminating leakage in some critical locations.

• Adjustment of all oat switches to control the min/max level in each tank.

IMPLEMENTATION BY THE SOLUTION PARTNER :

• Deliver a full control , power and automation system for all the facility

• implementing control functions and suggesting operation philosophy

• Continuous Support and availability , guaranteed know-how to be provided by the SP

• Product Quality, full integration, easy to configure.

BENEFITS FOR THE CUSTOMER :

• Siemens automation system used was based on Simatic S7-1500 and TIA (Totally Integrated Automation)

• Individual controllers were used, where all the system was controlled using one main PLC.

• Easy operation/maintenance

• System is fully automated and doesn’t require any personal intervention

• Maintenance cost is reduced by using highest product quality , fault detection and event logging that allows to trace problems causes.