Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the updraftplus domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/iteclbco/projects.automationmate.com/wp-includes/functions.php on line 6114

Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the wordpress-seo domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/iteclbco/projects.automationmate.com/wp-includes/functions.php on line 6114
Qatar Gas - Package unit control system - Automate

Qatar Gas – Package unit control system

REQUIREMENTS OF THE CUSTOMER :


•Software development and graphics development for the control panel and operator unit.
•Control and monitor the two package units with field devices.
•Control programming and graphics development as per Qatar GAS standard.
•Integration of fire alarm and DCS systems via hard wiring for control system monitoring.
•Training for Qatar GAS maintenance team.

BENEFITS FOR THE CUSTOMER:


•Package Unit and 3rd party systems monitored and controlled by operator unit so the control can be done from one place.
•Efficient maintenance and troubleshooting because all the alarms are configured in the operator unit.
•Reduction of operational costs by identifying the errors and fault functions whenever occurring.
•Better control of internal comfort conditions and monitoring all risks.
•Less Manpower requirement to maintain the system.
•Less maintenance cost since Siemens products are more reliable in comparison with other brands.


IMPLEMENTATION:

Programming the DDC controller as per Qatar GAS standards and requirements.
•Supervision of the sensor installation and cabling.
•Panel testing and commissioning and graphics development for operator unit.
•Panel FAT & SAT with Qatar GAS team.
•Fire integration and testing with fire alarm system.
•Training for Qatar GAS maintenance team.

Download PDF

For any inquiry or support, please contact us at support@automationmate.com