Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the updraftplus domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/iteclbco/projects.automationmate.com/wp-includes/functions.php on line 6114

Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the wordpress-seo domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/iteclbco/projects.automationmate.com/wp-includes/functions.php on line 6114
Sidem BMS by Automate - Automate

Sidem BMS by Automate

REQUIREMENTS OF THE CUSTOMER :

• Optimize and Manage the Main Generators Behavior as well as the Power Distribution of the whole factory

• Replacing the existing PLC which is out of Service and reprogram the new PLC in order to fit the requirement

• Give the client an accurate control system that can manage all the generators systems.

IMPLEMENTATION BY THE SOLUTION PARTNER :

• The control tasks are divided into 3 Main Parts:

• Adding / Removing 7 Generators ( 1. 2MW each) on the GRID according to the actual load read through Analog Inputs ( Current and Cos Fi ).

• Adding / Removing 11 Departures according to the actual load and to the number of generators on the GRID. The peaks time affects the actual load, so the software will take care of the departures management.

• Adding / Removing 24 Loads type. Actually, the operator has the right to choose Load Control or Departures Control.

BENEFITS OF THE CUSTOMER :

• Easy Switching between Manual and Auto Mode. A Multi-touch 12inch Control panel with the Indusoft Application is used to monitor the consumption, loads, and departures. In addition, the administrator can set all thresholds for all generators and departures.

• Power Measurement innovative Modules will give the user all required data for each generator such as Voltage, Current, Cos Phi, Active Power, Reactive Power, Negative Power, Frequency…

For any inquiry or support, please contact us at support@automationmate.com