Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the acf domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/iteclbco/projects.automationmate.com/wp-includes/functions.php on line 6170

Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the updraftplus domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/iteclbco/projects.automationmate.com/wp-includes/functions.php on line 6170

Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the wordpress-seo domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/iteclbco/projects.automationmate.com/wp-includes/functions.php on line 6170

Warning: Cannot modify header information - headers already sent by (output started at /home/iteclbco/projects.automationmate.com/wp-includes/functions.php:6170) in /home/iteclbco/projects.automationmate.com/wp-includes/feed-rss2.php on line 8
BMS Archives - Automate https://projects.automationmate.com/project-category/bms/ Your automation mate Tue, 10 May 2022 10:58:53 +0000 en-US hourly 1 https://wordpress.org/?v=7.0.2 Sidem BMS by Automate https://projects.automationmate.com/projects/sidem-bms-by-automate/ https://projects.automationmate.com/projects/sidem-bms-by-automate/#respond Wed, 18 Aug 2021 13:49:08 +0000 https://projects.automationmate.com/?post_type=portfolio&p=6239 REQUIREMENTS OF THE CUSTOMER : • Optimize and Manage the Main Generators Behavior as well as the Power Distribution of the whole factory • Replacing the existing PLC which is out of Service and reprogram the new PLC in order to fit the requirement • Give the client an accurate control system that can manage all…

The post Sidem BMS by Automate appeared first on Automate.

]]>
REQUIREMENTS OF THE CUSTOMER :

• Optimize and Manage the Main Generators Behavior as well as the Power Distribution of the whole factory

• Replacing the existing PLC which is out of Service and reprogram the new PLC in order to fit the requirement

• Give the client an accurate control system that can manage all the generators systems.

IMPLEMENTATION BY THE SOLUTION PARTNER :

• The control tasks are divided into 3 Main Parts:

• Adding / Removing 7 Generators ( 1. 2MW each) on the GRID according to the actual load read through Analog Inputs ( Current and Cos Fi ).

• Adding / Removing 11 Departures according to the actual load and to the number of generators on the GRID. The peaks time affects the actual load, so the software will take care of the departures management.

• Adding / Removing 24 Loads type. Actually, the operator has the right to choose Load Control or Departures Control.

BENEFITS OF THE CUSTOMER :

• Easy Switching between Manual and Auto Mode. A Multi-touch 12inch Control panel with the Indusoft Application is used to monitor the consumption, loads, and departures. In addition, the administrator can set all thresholds for all generators and departures.

• Power Measurement innovative Modules will give the user all required data for each generator such as Voltage, Current, Cos Phi, Active Power, Reactive Power, Negative Power, Frequency…

For any inquiry or support, please contact us at support@automationmate.com

The post Sidem BMS by Automate appeared first on Automate.

]]>
https://projects.automationmate.com/projects/sidem-bms-by-automate/feed/ 0
Qnaiwer Villa BMS https://projects.automationmate.com/projects/qnaiwer-villa-bms/ https://projects.automationmate.com/projects/qnaiwer-villa-bms/#respond Wed, 18 Aug 2021 13:37:16 +0000 https://projects.automationmate.com/?post_type=portfolio&p=6226 Full automation System to control Lighting Air Conditioning power Management and all fancy devices REQUIREMENTS OF THE CUSTOMER: •Control of all lighting, Jacuzzi, shutters, Sockets, and major home appliances through a reliable control system with the ability of the manual override in case of any failure. •The main task was to design the electrical system…

The post Qnaiwer Villa BMS appeared first on Automate.

]]>
Full automation System to control Lighting Air Conditioning

power Management and all fancy devices

REQUIREMENTS OF THE CUSTOMER:

•Control of all lighting, Jacuzzi, shutters, Sockets, and major home appliances through a reliable control system with the ability of the manual override in case of any failure.

•The main task was to design the electrical system aligned with the automation system to include one tablet for local control within the apartment and a mobile application for local and remote access over the internet.

•One of the challenges was to switch from full auto mode to manual mode keeping the Controller out of intervention playing all the control from the conventional local switch and pushbuttons for all lighting equipment as well as shutters.

BENEFITS OF THE CUSTOMER:

•Customer has benefited from the auto and manual mode at the same time by overriding the auto mode when needed or keeping the full-auto mode with application control as well as local control. Application is able to create scenes as per client requirements, monitor power consumption plays media and movies from the HDD Library…

•Maintenance Cost is reduced due to the high availability of the system, knowing that conventional electrical components were used, non-sophisticated, and found in the local market.

Download PDF

For any inquiry or support, please contact us at support@automationmate.com

The post Qnaiwer Villa BMS appeared first on Automate.

]]>
https://projects.automationmate.com/projects/qnaiwer-villa-bms/feed/ 0
Musheireb Metro-Building automation control system field devices https://projects.automationmate.com/projects/musheireb-metro-building-automation-control-system-field-devices/ https://projects.automationmate.com/projects/musheireb-metro-building-automation-control-system-field-devices/#respond Wed, 18 Aug 2021 12:41:21 +0000 https://projects.automationmate.com/?post_type=portfolio&p=6192 REQUIREMENTS OF THE CUSTOMER: Supply BMS field devices and FCU control panel. Testing and commissioning for the field devices and FCU control panel including BMS interface. Supervision for installation and wiring. BTU meters and communication protocol conversion gateway supply, testing, and commissioning. Provide training for the Qatar Rail maintenance team. BENEFITS FOR THE CUSTOMER: The…

The post Musheireb Metro-Building automation control system field devices appeared first on Automate.

]]>
REQUIREMENTS OF THE CUSTOMER:

  • Supply BMS field devices and FCU control panel.
  • Testing and commissioning for the field devices and FCU control panel including BMS interface.
  • Supervision for installation and wiring.
  • BTU meters and communication protocol conversion gateway supply, testing, and commissioning.
  • Provide training for the Qatar Rail maintenance team.

BENEFITS FOR THE CUSTOMER:

  • The support is given for installation and wiring so the issues for field devices will be minimal.
  • Products are more reliable and a three-year replacement warranty is provided.
  • Testing is done by specialists so BMS main integrator job will be easy.
  • Maintenance support is provided at any time.
  • Training provided for technicians for installation and wiring so they will do proper work based on the training.

IMPLEMENTATION:

  • Programming and testing commissioning for FCU control panel.
  • Supervision for the sensor installation and cabling.
  • BTU meter configuration and flow meter configuration.
  • Water meter configuration and BMS interface through a communication protocol.
  • Field device testing and BMS interface.
  • Provide training for the Qatar Rail maintenance team.

Download PDF

For any inquiry or support, please contact us at support@automationmate.com

The post Musheireb Metro-Building automation control system field devices appeared first on Automate.

]]>
https://projects.automationmate.com/projects/musheireb-metro-building-automation-control-system-field-devices/feed/ 0
Majida farm BMS system https://projects.automationmate.com/projects/majida-farm-bms-system/ https://projects.automationmate.com/projects/majida-farm-bms-system/#respond Wed, 18 Aug 2021 08:32:15 +0000 https://projects.automationmate.com/?post_type=portfolio&p=6159 REQUIREMENTS OF THE CUSTOMER : •Software development and BMS system graphics development for the control panel and management station.•Integration of mechanical equipment such as AHU, VRV, EF, generators, and pumps through Modbus communication and hard-wired signal.•Integration of Irrigation Hunter System into the SCADA.•Integration of Home Automation into the SCADA through BACnet IP.  BENEFITS FOR THE…

The post Majida farm BMS system appeared first on Automate.

]]>
REQUIREMENTS OF THE CUSTOMER :


•Software development and BMS system graphics development for the control panel and management station.
•Integration of mechanical equipment such as AHU, VRV, EF, generators, and pumps through Modbus communication and hard-wired signal.
•Integration of Irrigation Hunter System into the SCADA.
•Integration of Home Automation into the SCADA through BACnet IP.
 

BENEFITS FOR THE CUSTOMER:


•All building equipment and third-party systems are monitored and controlled by the BMS management station so it’s easy to do the control from one place.
•Maintenance and troubleshooting will be easier because all the alarms are configured in the management station.
•It is possible to reduce operational costs by identifying the errors and fault functions when they occur.
•Less manpower to maintain the system.
•Fewer maintenance costs as Siemens products are more reliable in comparison with other brands.
 

IMPLEMENTATION:


• Programming for each building automation station, Integration with mechanical equipment such as AHU, VRV through Modbus communication.
• Supervision of the sensor installation and cabling.
• Third-party integration of irrigation hunter system through hunter special serial communication converted to Bacnet IP protocol and integrated into management station.
• Home automation system directly integrated into the management station.
• Experienced engineer support on-site for commissioning.

Download PDF

For any inquiry or support, please contact us at support@automationmate.com

The post Majida farm BMS system appeared first on Automate.

]]>
https://projects.automationmate.com/projects/majida-farm-bms-system/feed/ 0
Control & Power management at a 5 STAR Hotel Monte Cassino https://projects.automationmate.com/projects/fancy-controlling-power-management-at-a-5-star-hotel-monte-cassino/ https://projects.automationmate.com/projects/fancy-controlling-power-management-at-a-5-star-hotel-monte-cassino/#respond Wed, 18 Aug 2021 07:59:27 +0000 https://projects.automationmate.com/?post_type=portfolio&p=6147 Click on the link to check the Facebook page of the Hotel: https://www.facebook.com/MonteCassinoLeb -ATS for switching between 3 Sources: EDL, Generator1 (300kVA), Generator2 (200kVA).AnS7-1200Controller is installed to manage the switching between sources according to actual consumption read through Profibus communication with Socomec Power Meter. Departures are energized progressively after switching procedures in a delayed sequence…

The post Control & Power management at a 5 STAR Hotel Monte Cassino appeared first on Automate.

]]>
Click on the link to check the Facebook page of the Hotel:

https://www.facebook.com/MonteCassinoLeb

-ATS for switching between 3 Sources: EDL, Generator1 (300kVA), Generator2 (200kVA).AnS7-1200Controller is installed to manage the switching between sources according to actual consumption read through Profibus communication with Socomec Power Meter. Departures are energized progressively after switching procedures in a delayed sequence to maintain generators’ lifetime.

-BMS panels are installed on every floor: Underground, Level -1, Lobby, Level 1, Level 2. The user has the access to energizing the AC of every room in the homeland to enable-disable the heating system of each room as well. In addition to feedbacks of AC, functionalities are monitored on the control PC and reported as alarms in case of any malfunction. At the lobby level, dimming of all zones is possible through Dimming Module from BECKHOFF for spots direct dimming and analog outputs control 0-10V for strip lines indirect lights. Crushers and heating systems feedback is monitored as well on the control PC and is reported as alarms with horns in case of any serious malfunction. The water Level and fuel levels of all tanks are displayed…

Click on the link to check the Facebook page of the Hotel:

https://www.facebook.com/MonteCassinoLeb

Project Details

For any inquiry or support, please contact us at support@automationmate.com

 

The post Control & Power management at a 5 STAR Hotel Monte Cassino appeared first on Automate.

]]>
https://projects.automationmate.com/projects/fancy-controlling-power-management-at-a-5-star-hotel-monte-cassino/feed/ 0
ETS. MICHEL NAJJAR https://projects.automationmate.com/projects/ets-michel-najjar/ https://projects.automationmate.com/projects/ets-michel-najjar/#respond Wed, 18 Aug 2021 07:08:57 +0000 https://projects.automationmate.com/?post_type=portfolio&p=6127 REQUIREMENTS OF THE CUSTOMER: Full data monitoring over different protocols with all site components and Accurate Control. • Siemens PLC Configuration. • Operator workstation and control modules. • HMI software configuration (SCADA). • Automation Panel fabrication. • Electrical Drawings. Testing and commissioning. •All types of Modbus communication RTU. BENEFITS OF THE CUSTOMER: •The customer has…

The post ETS. MICHEL NAJJAR appeared first on Automate.

]]>
REQUIREMENTS OF THE CUSTOMER:

Full data monitoring over different protocols with all site components and Accurate Control.

• Siemens PLC Configuration.

• Operator workstation and control modules.

• HMI software configuration (SCADA).

• Automation Panel fabrication.

• Electrical Drawings.

Testing and commissioning.

•All types of Modbus communication RTU.


BENEFITS OF THE CUSTOMER:

•The customer has the efficiency, throughput, quality.
•Save time by troubleshooting and monitoring, full automation control with SCADA System.
•It is possible to reduce production costs for the goods manufactured for Fuel.
•It is possible to reduce operational Costs with 1 operator can monitoring all the conditions controlled.
•It is possible to reduce maintenance costs, easy to maintenance by check the alarm page in the SCADA and follow the error message.
Implementation:

RTU.
•Friendly use and fast support.
•TIA V13 and Indusoft.
•The Decision fits in with the customer’s overall strategy perfectly.

Download PDF

For any inquiry or support, please contact us at support@automationmate.com

The post ETS. MICHEL NAJJAR appeared first on Automate.

]]>
https://projects.automationmate.com/projects/ets-michel-najjar/feed/ 0
Cold Room Monitoring Scada System https://projects.automationmate.com/projects/cold-room-monitoring-scada-system/ https://projects.automationmate.com/projects/cold-room-monitoring-scada-system/#respond Tue, 17 Aug 2021 13:56:55 +0000 https://projects.automationmate.com/?post_type=portfolio&p=6110 Scada system to monitor and control the compressors in order to maintain the temperature in the cold rooms, and to send sms and emails when any alarms or faults occur. For any inquiry or support, please contact us at support@automationmate.com

The post Cold Room Monitoring Scada System appeared first on Automate.

]]>
Scada system to monitor and control the compressors in order to maintain the temperature in the cold rooms, and to send sms and emails when any alarms or faults occur.

For any inquiry or support, please contact us at support@automationmate.com

The post Cold Room Monitoring Scada System appeared first on Automate.

]]>
https://projects.automationmate.com/projects/cold-room-monitoring-scada-system/feed/ 0
Building management system/ GSA https://projects.automationmate.com/projects/building-management-system-gsa/ https://projects.automationmate.com/projects/building-management-system-gsa/#respond Tue, 17 Aug 2021 12:34:40 +0000 https://projects.automationmate.com/?post_type=portfolio&p=6097 PROJECT REALISATION: – Building management system/ GSA – Concorde Hotel /Realisation: 2014 CUSTOMER ADVANTAGES: – Operator is instantly notified of any error that might occur and is updated with different signals values from sensors installed (Levels, temperature, pressure…). – Alarm history allows the operator/manager to keep track of the date and time of the errors…

The post Building management system/ GSA appeared first on Automate.

]]>
PROJECT REALISATION:

– Building management system/ GSA – Concorde Hotel /Realisation: 2014

CUSTOMER ADVANTAGES:

– Operator is instantly notified of any error that might occur and is updated with different signals values from sensors installed (Levels, temperature, pressure…).

– Alarm history allows the operator/manager to keep track of the date and time of the errors when they occurred.

– Trends allow keeping track of different analog inputs readings.

For any inquiry or support, please contact us at support@automationmate.com

The post Building management system/ GSA appeared first on Automate.

]]>
https://projects.automationmate.com/projects/building-management-system-gsa/feed/ 0
Al Rayyan Stadium-Supply of FCU control panel and field devices https://projects.automationmate.com/projects/al-rayyan-stadium-supply-of-fcu-control-panel-and-field-devices/ https://projects.automationmate.com/projects/al-rayyan-stadium-supply-of-fcu-control-panel-and-field-devices/#respond Tue, 17 Aug 2021 11:58:29 +0000 https://projects.automationmate.com/?post_type=portfolio&p=6081 REQUIREMENTS OF THE CUSTOMER : •Supply BMS field devices and FCU control panel.•Testing and commissioning for the field devices and FCU control panel including BMS interface.•Supervision for installation and wiring.•Training for the maintenance team. BENEFITS FOR THE CUSTOMER: •Support given for installation and wiring preventing any eventual issues.•Products are more reliable.•Testing done by specialists so…

The post Al Rayyan Stadium-Supply of FCU control panel and field devices appeared first on Automate.

]]>
REQUIREMENTS OF THE CUSTOMER :

•Supply BMS field devices and FCU control panel.
•Testing and commissioning for the field devices and FCU control panel including BMS interface.
•Supervision for installation and wiring.
•Training for the maintenance team.


BENEFITS FOR THE CUSTOMER:


•Support given for installation and wiring preventing any eventual issues.
•Products are more reliable.
•Testing done by specialists so BMS main integrator job will be easy.
•Maintenance support provided at any time.
•Training provided for technicians for installation and wiring so they will do proper work based on the training.


IMPLEMENTATION:


• Programming, testing, and commissioning for FCU control panel.
• Supervision for the sensor installation and cabling.
• Field device testing and BMS interface.

For any inquiry or support, please contact us at support@automationmate.com

The post Al Rayyan Stadium-Supply of FCU control panel and field devices appeared first on Automate.

]]>
https://projects.automationmate.com/projects/al-rayyan-stadium-supply-of-fcu-control-panel-and-field-devices/feed/ 0